summaryrefslogtreecommitdiff
path: root/kernel
diff options
context:
space:
mode:
authorPeter Zijlstra <peterz@infradead.org>2017-04-14 17:24:02 +0200
committerGreg Kroah-Hartman <gregkh@linuxfoundation.org>2017-07-21 07:42:23 +0200
commit7c3f08eadcfdfca74b2563e941e645b52cc34622 (patch)
treebd4f60da05c890e7be7f14d09ccc042626b1cd93 /kernel
parent542ebc96c2004c665a4a6e3d2f2813685f0de7a3 (diff)
sched/topology: Fix building of overlapping sched-groups
commit 0372dd2736e02672ac6e189c31f7d8c02ad543cd upstream. When building the overlapping groups, we very obviously should start with the previous domain of _this_ @cpu, not CPU-0. This can be readily demonstrated with a topology like: node 0 1 2 3 0: 10 20 30 20 1: 20 10 20 30 2: 30 20 10 20 3: 20 30 20 10 Where (for example) CPU1 ends up generating the following nonsensical groups: [] CPU1 attaching sched-domain: [] domain 0: span 0-2 level NUMA [] groups: 1 2 0 [] domain 1: span 0-3 level NUMA [] groups: 1-3 (cpu_capacity = 3072) 0-1,3 (cpu_capacity = 3072) Where the fact that domain 1 doesn't include a group with span 0-2 is the obvious fail. With patch this looks like: [] CPU1 attaching sched-domain: [] domain 0: span 0-2 level NUMA [] groups: 1 0 2 [] domain 1: span 0-3 level NUMA [] groups: 0-2 (cpu_capacity = 3072) 0,2-3 (cpu_capacity = 3072) Debugged-by: Lauro Ramos Venancio <lvenanci@redhat.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Mike Galbraith <efault@gmx.de> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Thomas Gleixner <tglx@linutronix.de> Cc: linux-kernel@vger.kernel.org Fixes: e3589f6c81e4 ("sched: Allow for overlapping sched_domain spans") Signed-off-by: Ingo Molnar <mingo@kernel.org> Signed-off-by: Greg Kroah-Hartman <gregkh@linuxfoundation.org>
Diffstat (limited to 'kernel')
-rw-r--r--kernel/sched/core.c2
1 files changed, 1 insertions, 1 deletions
diff --git a/kernel/sched/core.c b/kernel/sched/core.c
index 737381d601e6..19f84d98d24c 100644
--- a/kernel/sched/core.c
+++ b/kernel/sched/core.c
@@ -6148,7 +6148,7 @@ build_overlap_sched_groups(struct sched_domain *sd, int cpu)
cpumask_clear(covered);
- for_each_cpu(i, span) {
+ for_each_cpu_wrap(i, span, cpu) {
struct cpumask *sg_span;
if (cpumask_test_cpu(i, covered))